Booker High School
DMK Associates, Inc. performed overall site planning which included athletic fields, a grading and drainage design with an adiCPR model of existing and proposed conditions for entire site as well as access roads, sidewalks, and parking. Utility work included preparation of a site plan showing exisitng and proposed sewer and water lines including fire protection, gravity sewers, force mains, lift stations and connection to the City of Sarasota water and sewer systems.
In addition, DMK provided engineering services for the School Board of Sarasota County for the relocation and re-alignment of Orange Avenue located within the City of Sarasota. The roadway, which has been constructed, was part of the 47 acre Booker High School demolition and rebuild. DMK designed and permitted the new roadway, water main, fire line, sanitary sewer lines and stormwater drainage located within the new Orange Avenue right-of-way. DMK worked with the City of Sarasota and the School Board of Sarasota County to develop a design to ensure the utilities provided uninterrupted service to the City of Sarasota and the Booker High School campus throughout the construction of the project.